Main crane operator above 2000 tons

 

Recruiter:

MECS Africa

Job Ref:

JHB008333/AR

Date posted:

Tuesday, February 9, 2021

Location:

Netherlands, France

Salary:

Negotiable


SUMMARY:
International EP has an opportunity for a Main Crane operator on two of the construction vessels

POSITION INFO:

Duties:

Operate and takes care of the crane
Carry out lifting operation in a safe manner
Maintain contact with the bridge and the Deck Foreman during lifting operations

Role spesifc  requirements:

NO drilling , NO jack up, NO onshore heavy lift, ONLY floating & semisub vessels are considered suitable for this position

  • Heavy Lift experience ( Jacket installation, Windfarm Offshore Installation, Pile installation, Hammering, decommissioning of platforms, Top side Installation, etc.)
  • IMCA log book , with previous heavy lift experience records
  • Experience with Huisman / NOV AmClyde (is a plus)
  • Experience in managing tugger hoist operators during heavy lifts
  • Experience in heavy Lift on DP Vessels
  • Experience in heavy lifts > 2000 tons
  • At least 5 years’ experience in heavy lifts in combination of vessel ballast system
  • Stage 3 certificate BS7121 p11 (Sparrows or Enermech would be a plus)
  • Also candidates with experience with “old “ generation cranes, such as Clyde Crane, full mechanical system,  will be considered

General requirements:

Operate the crane within the designed crane load capacity, in accordance with the derating tables applicable to existing
weather and sea state conditions
Performs basket transfers where permitted and safe to do so
Hold the Offshore Crane Operator certification (level 2 for unsupervised inboard lifts; level 3 for unsupervised offshore lifts)
Be aware of the surroundings in terms of potential clashes with other vessel equipment
Be aware of crane limits in terms of reach and capacity
On vessels with multiple cranes, be aware of the interaction with other cranes and proactively intervene in order to avoid
any interference during simultaneous operations
Interact with the supervisors in order to define the lifting procedures
Report any crane equipment malfunctioning to own supervisor
Ensure that all safe work procedures for crane lifts are adhered to
Liaise with Bridge and 1st Assistant/Deck Foreman while executing any lifts that could affect the vessel stability
Make daily inspection of crane cables
Carry out daily routine maintenance to the crane and the operator''s cabin
Keep a high level of housekeeping on the crane and in the operator''s cabin
Liaise with 2nd Engineer/Crane Engineer/Chief Electrician/Vessel Equipment Engineer on crane maintenance and
performance, in order to ensure that repairs and preventive maintenance are carried out properly
Carry out weekly inspection of the crane in accordance with the manufacturer''s recommendations
Fill up the crane log book as required for all lifts above 50 ton
Issue work instructions to the Tuggerhoist Operators
Stop the lifting activity if required on safety or technical grounds, if continuing could cause any damages or injuries
Report to the 1st Assistant, while taking instructions directly from the Deck Foreman during lifting operations

 



 

NB! This job is now closed. You can apply for other jobs by uploading your CV.



 

 

 

Similar jobs you might be interested in:

Crane Operator
Location: Cape Town
Salary: 60 Hourly
Cape-Town based company seeks a crane operator
18 days ago


Create a free job alert for Main crane operator above 2000 tons in Netherlands

Enter your email address below and we will email you similar jobs when they become available:

You can cancel at any time. We will not spam you.
By giving us your email address your agree to our Terms and Conditions